Bill
This bill reauthorizes through FY2028 the planning, design, and construction of the Assiniboine and Sioux Rural Water System and the Dry Prairie Rural Water System, both located in Montana.
Overview and Timeline are the same for every version. Text and Votes below change with the version you select.
This version was not decided by a recorded roll call — amendments are often agreed to by voice vote, and a bill text is only voted on at passage.